Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
From MaRDI portal
Publication:812435
DOI10.1007/s10700-004-5870-9zbMath1082.90036OpenAlexW2002301261MaRDI QIDQ812435
Hiroaki Ishii, Kanthen K. Harikrishnan
Publication date: 23 January 2006
Published in: Fuzzy Optimization and Decision Making (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10700-004-5870-9
linear programmingschedulingresource allocationbatchingbi-criteriafuzzy due-dateminimum satisfaction degree
Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Theory of fuzzy sets, etc. (03E72)
Related Items (6)
Optimality region for job permutation in single-machine scheduling with uncertain processing times ⋮ Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine ⋮ USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES ⋮ Single machine scheduling problem with interval processing times and total completion time objective ⋮ Survey on fuzzy shop scheduling ⋮ USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS
Cites Work
- One-pass batching algorithms for the one-machine problem
- A polynomial algorithm for a one machine batching problem
- One machine scheduling problem with fuzzy duedates
- Single machine batch scheduling with deadlines and resource dependent processing times
- Scheduling with batching: A review
- Batching to Minimize Flow Times on One Machine
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- Single machine batch scheduling with resource dependent setup and processing times
This page was built for publication: Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date