Programmed control of two-stage stochastic production systems
From MaRDI portal
Publication:827889
DOI10.1134/S0005117920010063zbMath1455.93211OpenAlexW3008816140MaRDI QIDQ827889
Publication date: 14 January 2021
Published in: Automation and Remote Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1134/s0005117920010063
Related Items (1)
Cites Work
- Multicriterial multi-index resource scheduling problems
- Multiindex optimal production planning problems
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Optimal management of two-stage stochastic production systems
- Optimal planning for two-stage stochastic industrial systems
- Planning and Scheduling in Manufacturing and Services
This page was built for publication: Programmed control of two-stage stochastic production systems