Scheduling problems with a weight-modifying-activity
From MaRDI portal
Publication:828829
DOI10.1007/S10479-020-03782-7zbMath1506.90107OpenAlexW3084420467MaRDI QIDQ828829
Publication date: 5 May 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-020-03782-7
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Scheduling with time-changing effects and rate-modifying activities
- Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
- Machine scheduling with a rate-modifying activity
- A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
- Due-date assignment and maintenance activity scheduling problem
- SCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES
- Scheduling independent tasks to reduce mean finishing time
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Single-machine scheduling with maintenance and repair rate-modifying activities
This page was built for publication: Scheduling problems with a weight-modifying-activity