Exact method for the two-machine flow-shop problem with time delays
From MaRDI portal
Publication:829189
DOI10.1007/S10479-018-3082-XzbMath1462.90050OpenAlexW2898514716MaRDI QIDQ829189
Mehdi Serairi, Mohamed Amine Mkadem, Aziz Moukrim
Publication date: 5 May 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-018-3082-x
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- A practical use of Jackson's preemptive schedule for solving the job shop problem
- Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- A survey of scheduling problems with setup times or costs
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Shop Problems With Two Machines and Time Lags
- Lower Bounds for the Two-Machine Flow Shop Problem with Time Delays
- UET flow shop scheduling with delays
- Algorithms and Computation
- A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays
This page was built for publication: Exact method for the two-machine flow-shop problem with time delays