Investigating the recoverable robust single machine scheduling problem under interval uncertainty
From MaRDI portal
Publication:833004
DOI10.1016/j.dam.2022.02.005zbMath1485.90050OpenAlexW4220760292MaRDI QIDQ833004
Publication date: 28 March 2022
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2022.02.005
Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36) Approximation algorithms (68W25)
Related Items (1)
Cites Work
- Single machine scheduling problems with uncertain parameters and the OWA criterion
- Exact and heuristic algorithms for the interval data robust assignment problem
- On the robust single machine scheduling problem
- Complexity of single machine scheduling problems under scenario-based uncertainty
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
- Robust discrete optimization and its applications
- Single machine scheduling with scenarios
- A family of inequalities valid for the robust single machine scheduling polyhedron
- Risk-averse single machine scheduling: complexity and approximation
- The recoverable robust spanning tree problem with interval costs is polynomially solvable
- Recoverable robust spanning tree problem under interval uncertainty representations
- Robust recoverable and two-stage selection problems
- Robust scheduling with budgeted uncertainty
- Complexity of minimizing the total flow time with interval data and minmax regret criterion
- A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data
- Recoverable robust shortest path problems
- The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
This page was built for publication: Investigating the recoverable robust single machine scheduling problem under interval uncertainty