Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology
From MaRDI portal
Publication:835552
DOI10.1007/s10951-007-0013-0zbMath1168.90385OpenAlexW1993918976MaRDI QIDQ835552
Avraham Shtub, Izack Cohen, Boaz Golany
Publication date: 28 August 2009
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-007-0013-0
Related Items (2)
Resource allocation in multi-class dynamic PERT networks with finite capacity ⋮ Resource allocation in dynamic PERT networks with finite capacity
Cites Work
- Unnamed Item
- Unnamed Item
- Optimization of computer simulation models with rare events
- Estimating maintenance effort by analogy
- Hierarchical models for multi-project planning and scheduling
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time
This page was built for publication: Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology