A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem

From MaRDI portal
Publication:835579

DOI10.1007/s10951-007-0048-2zbMath1168.90471OpenAlexW2047685618MaRDI QIDQ835579

Francis Sourd, Safia Kedad-Sidhoum

Publication date: 28 August 2009

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-007-0048-2




Related Items (25)

A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penaltiesFast neighborhood search for the single machine earliness-tardiness scheduling problemOptimal restricted due date assignment in schedulingExact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penaltiesAn exact algorithm for the bi-objective timing problemImproving schedule stability in single-machine rescheduling for new operation insertionMinimizing total earliness and tardiness on a single machine using a hybrid heuristicGenerating artificial chromosomes with probability control in genetic algorithm for machine scheduling problemsMinimizing weighted earliness-tardiness on a single machine with a common due date using quadratic modelsAn Exact Algorithm for the Single-Machine Earliness–Tardiness Scheduling ProblemOn the exact solution of a large class of parallel machine scheduling problemsIntegrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding costJust‐in‐time scheduling problem with due windows and release dates for precast bridge girdersScheduling with returnable containersScheduling with time-dependent discrepancy timesA dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle timeOn scheduling a single machine to minimize a piecewise linear objective function: A compact MIP formulation\textit{Branch} \& \textit{Memorize} exact algorithms for sequencing problems: efficient embedding of memorization into search treesA branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penaltiesThe one-machine just-in-time scheduling problem with preemptionA new model for the preemptive earliness-tardiness scheduling problemIntegrated optimization of test case selection and sequencing for reliability testing of the mainboard of Internet backbone routersA unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problemsLagrangian domain reductions for the single machine earliness-tardiness problem with release datesTime-indexed formulations for scheduling chains on a single machine: an application to airborne radars



Cites Work




This page was built for publication: A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem