Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
From MaRDI portal
Publication:835585
DOI10.1007/s10951-007-0021-0zbMath1168.90453OpenAlexW3124824798MaRDI QIDQ835585
Olivier Lambrechts, Erik L. Demeulemeester, Willy S. Herroelen
Publication date: 28 August 2009
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/121094
Related Items (24)
A genetic algorithm for the robust resource leveling problem ⋮ A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem ⋮ Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ Applying local rescheduling in response to schedule disruptions ⋮ Tabu search for proactive project scheduling problem with flexible resources ⋮ A heuristic approach for resource constrained project scheduling with uncertain activity durations ⋮ Robust execution strategies for project scheduling with unreliable resources and stochastic durations ⋮ A mathematical model for the management of a service center ⋮ Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm ⋮ Time slack-based techniques for robust project scheduling subject to resource uncertainty ⋮ Robust scheduling for berth allocation and quay crane assignment problem ⋮ Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ Reactive scheduling in the multi-mode RCPSP ⋮ Proactive policies for the stochastic resource-constrained project scheduling problem ⋮ A robust optimization approach for the multi-mode resource-constrained project scheduling problem ⋮ Proactive and reactive strategies for football league timetabling ⋮ Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty ⋮ Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations ⋮ The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework ⋮ Robust berth scheduling with uncertain vessel delay and handling time ⋮ Operating room planning and scheduling: a literature review ⋮ Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- The generation of stable project plans
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Executing production schedules in the face of uncertainties: a review and some future directions
- The complexity of machine scheduling for stability with a single disrupted job
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Bandwidth Packing: A Tabu Search Approach
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
This page was built for publication: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities