Time-constrained project scheduling
From MaRDI portal
Publication:835591
DOI10.1007/s10951-008-0059-7zbMath1168.90442OpenAlexW2115631771MaRDI QIDQ835591
J. M. J. Schutten, T. A. Guldemond, Jacob Jan Paulus, Johann L. Hurink
Publication date: 28 August 2009
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-008-0059-7
Related Items (5)
A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ An exact algorithm for an integrated project staffing problem with a homogeneous workforce ⋮ Time-constrained project scheduling ⋮ A mathematical model for the management of a service center ⋮ Time-constrained project scheduling with adjacent resources
Uses Software
Cites Work
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- Time-constrained project scheduling
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: A survey of recent developments.
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Resource Constrained Scheduling within Fixed Project Durations
- Adaptive search for solving hard project scheduling problems
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: Time-constrained project scheduling