Scheduling unit time jobs with integer release dates to minimize the weighted number of tardy jobs
From MaRDI portal
Publication:839781
DOI10.1007/s10479-008-0479-yzbMath1279.90064OpenAlexW2048126803MaRDI QIDQ839781
Mitre C. Dourado, Jayme Luiz Szwarcfiter, Rosiane de Freitas Rodrigues
Publication date: 3 September 2009
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-008-0479-y
Related Items
Scheduling on parallel machines considering job-machine dependency constraints ⋮ Single machine scheduling with two competing agents, arbitrary release dates and unit processing times ⋮ Necessary and sufficient optimality conditions for scheduling unit time jobs on identical parallel machines ⋮ Unnamed Item ⋮ Scheduling problem with multi-purpose parallel machines
Cites Work
- Unnamed Item
- Scheduling equal processing time jobs to minimize the weighted number of late jobs
- A note on scheduling equal-length jobs to maximize throughput
- How useful are preemptive schedules?
- Ten notes on equal-processing-time scheduling: at the frontiers of solvability in polynomial time
- Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times
- Complexity results for single-machine problems with positive finish-start time-lags
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems