Bi-objective resource-constrained project scheduling with robustness and makespan criteria

From MaRDI portal
Publication:850236

DOI10.1016/j.amc.2005.11.160zbMath1103.90039OpenAlexW2022632482MaRDI QIDQ850236

Jamal Arkat, Babak Abbasi, Shahram Shadrokh

Publication date: 15 November 2006

Published in: Applied Mathematics and Computation (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.amc.2005.11.160




Related Items (18)

Multi-mode resource availability cost problem with recruitment and release dates for resourcesBi-objective multi-mode project scheduling under risk aversionIntegration of electromagnetism with multi-objective evolutionary algorithms for RCPSPA Petri net-based framework for realistic project management and scheduling: an application in animation and videogamesThe contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insightsAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesA lexicographic approach to the robust resource-constrained project scheduling problemA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsResource tardiness weighted cost minimization in project schedulingResource constrained project scheduling subject to due dates: preemption permitted with penaltyMulti-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relationsImproved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problemExperimental evaluation of simulated annealing algorithms for the time-cost trade-off problemTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsA survey of variants and extensions of the resource-constrained project scheduling problemThe proactive and reactive resource-constrained project scheduling problemA fuzzy robustness measure for the scheduling of commissioned product development projectsA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING



Cites Work




This page was built for publication: Bi-objective resource-constrained project scheduling with robustness and makespan criteria