A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity

From MaRDI portal
Publication:853029

DOI10.1016/J.EJOR.2005.10.032zbMath1110.90029OpenAlexW2085351866MaRDI QIDQ853029

Jie Zhang, Felix T. S. Chan, Zheng Wang

Publication date: 15 November 2006

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.10.032




Related Items (2)




Cites Work




This page was built for publication: A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity