A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
From MaRDI portal
Publication:853448
DOI10.1016/j.fss.2006.04.009zbMath1100.90510OpenAlexW2088545402WikidataQ62309562 ScholiaQ62309562MaRDI QIDQ853448
Alejandra Duenas, Dobrila Petrovic
Publication date: 15 November 2006
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.fss.2006.04.009
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (4)
Distributionally robust scheduling on parallel machines under moment uncertainty ⋮ A survey of dynamic scheduling in manufacturing systems ⋮ Survey on fuzzy shop scheduling ⋮ Modeling and Managing Uncertainty in Process Planning and Scheduling
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A fuzzy-linguistic approach to a multi-criteria sequencing problem
- Single machine, scheduling problem with fuzzy precedence relation
- Executing production schedules in the face of uncertainties: a review and some future directions
- Scheduling under fuzziness
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Rescheduling for New Orders
- Rescheduling job shops under random disruptions
- Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach
- Predictable scheduling of a single machine with breakdowns and sensitive jobs
- Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
- Multicriteria scheduling using fuzzy theory and tabu search
- Outline of a New Approach to the Analysis of Complex Systems and Decision Processes
This page was built for publication: A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions