Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first
From MaRDI portal
Publication:853750
DOI10.1007/S10696-005-5992-6zbMath1101.90348OpenAlexW2088401120MaRDI QIDQ853750
Pyung-Hoi Koo, Jungdae Suh, Jaejin Jang
Publication date: 17 November 2006
Published in: International Journal of Flexible Manufacturing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-005-5992-6
Cites Work
- A dispatching method for automated guided vehicles by using a bidding concept
- Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
- Determination of optimal AGV fleet size for an FMS
- An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines
- AGV dispatching based on workload balancing
- Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system
- Connecting transport AMHS in a wafer fab
This page was built for publication: Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first