Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness
From MaRDI portal
Publication:856204
DOI10.1016/j.ejor.2005.06.067zbMath1111.90042OpenAlexW2065269629MaRDI QIDQ856204
Joseph Y.-T. Leung, Hairong Zhao, Yumei Huo
Publication date: 7 December 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.06.067
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (8)
Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints ⋮ Unary NP-hardness of minimizing the number of tardy jobs with deadlines ⋮ A survey of single machine scheduling to minimize weighted number of tardy jobs ⋮ Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work ⋮ A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem ⋮ Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem ⋮ Single-machine scheduling with positional due indices and positional deadlines ⋮ A note on the single machine scheduling to minimize the number of tardy jobs with deadlines
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Minimizing the number of late jobs in a stochastic setting using a chance constraint
- A dynamic programming algorithm for preemptive scheduling of a single machine to minimize the number of late jobs
- Complexity of single machine, multi-criteria scheduling problems
- Complexity of two dual criteria scheduling problems
- The Single Machine Early/Tardy Problem
- A note on a scheduling problem with dual criteria
- One machine sequencing to minimize mean flow time with minimum number tardy
- Minimizing Total Costs in One-Machine Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- An experimental comparison of solution algorithms for the single-machine tardiness problem
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- A note on the extension of a result on scheduling with secondary criteria
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
This page was built for publication: Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness