A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem

From MaRDI portal
Publication:857345

DOI10.1016/j.ejor.2005.12.009zbMath1110.90042OpenAlexW2006751452MaRDI QIDQ857345

Rubén Ruiz, Thomas Stützle

Publication date: 14 December 2006

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.12.009




Related Items

Scheduling a hybrid assembly-differentiation flowshop to minimize total flow timeSearch with evolutionary ruin and stochastic rebuild: a theoretic framework and a case study on exam timetablingExactly Solving Hard Permutation Flowshop Scheduling Problems on Peta-Scale GPU-Accelerated SupercomputersA two-stage flow-shop scheduling problem with incompatible job families and limited waiting timeIterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plantJust-in-time scheduling for a distributed concrete precast flow shop systemA strategic oscillation simheuristic for the time capacitated arc routing problem with stochastic demandsSolving real-size stochastic railway rapid transit network construction scheduling problemsMetaheuristics with restart and learning mechanisms for the no-idle flowshop scheduling problem with makespan criterionMetaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objectiveAssembly flowshop scheduling problem: speed-up procedure and computational evaluationA parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windowsMILP-based local search procedures for minimizing total tardiness in the no-idle permutation flowshop problemMathematical modelling and heuristic approaches to job-shop scheduling problem with conveyor-based continuous flow transportersMulti-objective energy-efficient hybrid flow shop scheduling using Q-learning and GVNS driven NSGA-IIAn iterated greedy algorithm for the planning of yarn‐dyeing boilersAn adaptive dynamic neighborhood crow search algorithm for solving permutation flow shop scheduling problemsParameter less hybrid IG-Jaya approach for permutation flow shop scheduling problemParticle therapy patient scheduling with limited starting time variations of daily treatmentsAn MO‐GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problemA review and classification on distributed permutation flowshop scheduling problemsA biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problemStochastic local search and parameters recommendation: a case study on flowshop problemsEvaluating the impact of grammar complexity in automatic algorithm designAn iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion timeIntelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problemAn iterated greedy algorithm for finding the minimum dominating set in graphsEfficient iterated greedy for the two-dimensional bandwidth minimization problemAn asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problemScheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturingPopulation-based iterated greedy algorithm for the S-labeling problemAn effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detectionA novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardinessThe seeds of the NEH algorithm: an overview using bibliometric analysisAn Artificial Bee Colony Based Hyper-heuristic for the Single Machine Order Acceptance and Scheduling ProblemThe Weighted Independent Domination Problem: ILP Model and Algorithmic ApproachesAn iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectivesSome effective heuristics for no-wait flowshops with setup times to minimize total completion timeAn iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup timesAn Iterated Local Search Algorithm for the Lot-Streaming Flow Shop Scheduling ProblemNew heuristics for no-wait flow shops with a linear combination of makespan and maximum latenessTotal tardiness minimization in permutation flow shops: a simple approach based on a variable greedy algorithmMinimizing shifts for personnel task scheduling problems: a three-phase algorithmUsing iterated local search for solving the flow‐shop problem: Parallelization, parametrization, and randomization issuesDiscrete/Binary ApproachConstraint guided accelerated search for mixed blocking permutation flowshop schedulingA scatter search algorithm for the distributed permutation flowshop scheduling problemNew hard benchmark for flowshop scheduling problems minimising makespanIterative beam search algorithms for the permutation flowshopAn evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup timesCarbon-efficient scheduling of flow shops by multi-objective optimizationA variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problemAn iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problemOn insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problemGrammar-based generation of stochastic local search heuristics through automatic algorithm configuration toolsMetaheuristics for the single machine weighted quadratic tardiness scheduling problemImproving the quality of heuristic solutions for the capacitated vertex \(p\)-center problem through iterated greedy local search with variable neighborhood descentThe Boolean quadratic programming problem with generalized upper bound constraintsIterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterionTwo-sided assembly line balancing problem of type I: improvements, a simple algorithm and a comprehensive studyIterated search methods for earliness and tardiness minimization in hybrid flowshops with due windowsAn iterated greedy algorithm with optimization of partial solutions for the makespan permutation flowshop problemA beam-search-based constructive heuristic for the PFSP to minimise total flowtimeA multi-start iterated local search algorithm for the generalized quadratic multiple knapsack problemCarousel greedy: a generalized greedy algorithm with applications in optimizationAn effective heuristic algorithm for the partial shop scheduling problemA hybrid discrete teaching-learning based meta-heuristic for solving no-idle flow shop scheduling problem with total tardiness criterionA biased random-key genetic algorithm for the maximum quasi-clique problemEfficient non-population-based algorithms for the permutation flowshop scheduling problem with makespan minimisation subject to a maximum tardinessA generalized constructive algorithm using insertion-based heuristicsTwo simple and effective heuristics for minimizing the makespan in non-permutation flow shopsA destroy and repair algorithm for the bike sharing rebalancing problemEfficient constructive and composite heuristics for the permutation flowshop to minimise total earliness and tardinessA computationally efficient branch-and-bound algorithm for the permutation flow-shop scheduling problemLocal search methods for the flowshop scheduling problem with flowtime minimizationThe weighted independent domination problem: integer linear programming models and metaheuristic approachesA self-tuning variable neighborhood search algorithm and an effective decoding scheme for open shop scheduling problems with travel/setup timesA cutoff time strategy based on the coupon collector's problemMinimization of maximum lateness on parallel machines with sequence-dependent setup times and job release datesErgonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: a multi-objective approachIterated greedy with random variable neighborhood descent for scheduling jobs on parallel machines with deterioration effectEvaluating balancing on social networks through the efficient solution of correlation clustering problemsImproving the anytime behavior of two-phase local searchApproaching the rank aggregation problem by local search-based metaheuristicsEnhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup timesAn iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effectsA hybrid TP+PLS algorithm for bi-objective flow-shop scheduling problemsReducing network and computation complexities in neural based real-time scheduling schemeDiversity controlling genetic algorithm for order acceptance and scheduling problemMinimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effectEffective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup timesAutomatic design of hybrid stochastic local search algorithms for permutation flowshop problemsA variable iterated greedy algorithm for the traveling salesman problem with time windowsThe reversibility property in a job-insertion tiebreaker for the permutational flow shop scheduling problemSynergy of genetic algorithm with extensive neighborhood search for the permutation flowshop scheduling problemA new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluationAn iterated greedy heuristic for a market segmentation problem with multiple attributesCooperative metaheuristics for the permutation flowshop scheduling problemHeuristics for a flowshop scheduling problem with stepwise job objective functionMinimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardinessMinimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithmAn iterated local search algorithm for the permutation flowshop problem with total flowtime criterionFlow shop scheduling with heterogeneous workersTabu-enhanced iterated greedy algorithm: a case study in the quadratic multiple knapsack problemA hybrid differential evolution algorithm with column generation for resource constrained job schedulingA hybrid discrete differential evolution algorithm for the no-idle permutation flow shop scheduling problem with makespan criterionHeuristics and metaheuristics for mixed blocking constraints flowshop scheduling problemsParallel hybrid heuristics for the permutation flow shop problemLarge neighbourhood search algorithms for the founder sequence reconstruction problemA variable block insertion heuristic for solving permutation flow shop scheduling problem with makespan criterionA memetic algorithm for the team orienteering problemSetting a common due date in a constrained flowshop: a variable neighbourhood search approachAccelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterionTheoretical insights into the augmented-neural-network approach for combinatorial optimizationMetaheuristic algorithms for the hybrid flowshop scheduling problemMakespan minimization for the \(m\)-machine ordered flow shop scheduling problemEnriched metaheuristics for the resource constrained unrelated parallel machine scheduling problemIterated greedy for the maximum diversity problemA genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibilityFast heuristics for minimizing the makespan in non-permutation flow shopsA multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteriaCompact formulations and an iterated local search-based matheuristic for the minimum weighted feedback vertex set problemIterated greedy local search methods for unrelated parallel machine schedulingShifting representation search for hybrid flexible flowline problemsModelling and multi-criteria analysis of the sustainability dimensions for the green vehicle routing problemBi-objective parallel machine scheduling with additional resources during setupsA discrete artificial bee colony algorithm for the no-idle permutation flowshop scheduling problem with the total tardiness criterionMinimizing the cycle time in two-sided assembly lines with assignment restrictions: improvements and a simple algorithmAutomatic algorithm design for hybrid flowshop scheduling problemsA discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup timesAlgorithms for a realistic variant of flowshop schedulingEffective IG heuristics for a single-machine scheduling problem with family setups and resource constraintsDesign and analysis of stochastic local search for the multiobjective traveling salesman problemA new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterionScheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristicsAn empirical analysis of the optimality rate of flow shop heuristicsA variable neighborhood search heuristic for nonnegative matrix factorization with application to microarray dataA survey of scheduling with parallel batch (p-batch) processingPermutation flow shop scheduling with multiple lines and demand plans using reinforcement learningVehicle dispatching plan for minimizing passenger waiting time in a corridor with buses of different sizes: model formulation and solution approachesThe distributed permutation flowshop scheduling problemLearning to select operators in meta-heuristics: an integration of Q-learning into the iterated greedy algorithm for the permutation flowshop scheduling problemAn iterated greedy algorithm with variable neighborhood descent for the planning of specialized diagnostic services in a segmented healthcare systemA best-of-breed iterated greedy for the permutation flowshop scheduling problem with makespan objectiveIterated greedy algorithms for a complex parallel machine scheduling problem


Uses Software


Cites Work