Experimental investigation of heuristics for resource-constrained project scheduling: an update

From MaRDI portal
Publication:858327

DOI10.1016/j.ejor.2005.01.065zbMath1116.90047OpenAlexW2070891082MaRDI QIDQ858327

Rainer Kolisch, Sönke Hartmann

Publication date: 9 January 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.01.065




Related Items (only showing first 100 items - show all)

A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resourceMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicAn Improved Genetic Algorithm for the Resource-Constrained Project Scheduling ProblemResource leveling in projects with flexible structuresA prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problemEvaluation of the quantiles and superquantiles of the makespan in interval valued activity networksNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsUnnamed ItemInsertion Algorithms with Justification for Solving the Resource-Constrained Project Scheduling ProblemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemFrance Telecom workforce scheduling problem: a challengeA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemA Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling ProblemA metaheuristic solution approach for the time-constrained project scheduling problemA flow-based tabu search algorithm for the RCPSP with transfer timesA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsAn integer programming approach to the multimode resource-constrained multiproject scheduling problemSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingAn approach using SAT solvers for the RCPSP with logical constraintsModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsComparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing RatesSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationOptimizing the strategic patient mix combining queueing theory and dynamic programmingAn exact composite lower bound strategy for the resource-constrained project scheduling problemA Petri net-based framework for realistic project management and scheduling: an application in animation and videogamesA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingMultiobjective project portfolio selection with fuzzy constraintsEvolutionary algorithms for multi-objective stochastic resource availability cost problemGenetic algorithm for the resource-constrained project scheduling problemA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesA polyhedral study of event-based models for the resource-constrained project scheduling problemGoing to the core of hard resource-constrained project scheduling instancesAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesA multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problemNew summary measures and datasets for the multi-project scheduling problemApplying local rescheduling in response to schedule disruptionsProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmProject scheduling with finite or infinite number of activity processing modes -- a surveyNew concepts for activity float in resource-constrained project managementResource constraint scheduling with a fractional shared resourceUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemR\&D pipeline management: task interdependencies and risk managementA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingMulti-mode resource-constrained project scheduling using RCPSP and SAT solversRobust execution strategies for project scheduling with unreliable resources and stochastic durationsA hybrid metaheuristic for the resource-constrained project scheduling problemIncreasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needsA hybrid multiobjective evolutionary approach for flexible job-shop scheduling problemsA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsExplaining the \texttt{cumulative} propagatorBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementMulti-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithmsRecent trends indicate rapid growth of nature-inspired optimization in academia and industryTri-directional scheduling scheme: theory and computationMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsA hybrid genetic algorithm for the resource-constrained project scheduling problemDesigning a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysisSolving the resource-constrained project scheduling problem using filter-and-fan approachA random key based genetic algorithm for the resource constrained project scheduling problemAn updated survey of variants and extensions of the resource-constrained project scheduling problemResource tardiness weighted cost minimization in project schedulingTowards merging binary integer programming techniques with genetic algorithmsTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesCompetence-driven project portfolio selection, scheduling and staff assignmentMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemAn approximate dynamic programming approach to project scheduling with uncertain resource availabilitiesA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemAn effective heuristic for project scheduling with resource availability costGeneric negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problemsA hybrid metaheuristic for resource-constrained project scheduling with flexible resource profilesBi-objective project portfolio selection and staff assignment under uncertaintyAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingNeuroGenetic approach for combinatorial optimization: an exploratory analysisVariable neighbourhood search: methods and applicationsMulti-objective decision analysis for competence-oriented project portfolio selectionA hybrid scatter search heuristic for personalized crew rostering in the airline industryAn exact algorithm for minimizing resource availability costs in project schedulingNeighborhood structures for the container loading problem: a VNS implementationEvent-based MILP models for resource-constrained project scheduling problemsA double genetic algorithm for the MRCPSP/maxA neurogenetic approach for the resource-constrained project scheduling problemTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsTheoretical insights into the augmented-neural-network approach for combinatorial optimizationA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA model, heuristic procedure and decision support system for solving the movie shoot scheduling problemUsing schedule risk analysis with resource constraints for project controlA survey of variants and extensions of the resource-constrained project scheduling problemEfficient priority rules for the stochastic resource-constrained project scheduling problemMinimizing total weighted late work in the resource-constrained project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingA 3/2-approximation for big two-bar charts packingTwo-bar charts packing problemApproximability results for the resource-constrained project scheduling problem with a single type of resources


Uses Software


Cites Work


This page was built for publication: Experimental investigation of heuristics for resource-constrained project scheduling: an update