Extended optimal age-replacement policy with minimal repair of a system subject to shocks
From MaRDI portal
Publication:858341
DOI10.1016/J.EJOR.2005.01.032zbMath1115.90023OpenAlexW1977154607MaRDI QIDQ858341
Publication date: 9 January 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.01.032
Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10) Renewal theory (60K05)
Related Items (24)
A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times ⋮ Dynamics of an optimal maintenance policy for imperfect repair models ⋮ Over-time and over-level replacement policies with random working cycles ⋮ Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements ⋮ A general age-replacement model with minimal repair under renewing free-replacement warranty ⋮ Comparison of combined stochastic risk processes and its applications ⋮ Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks ⋮ Optimal spare ordering policy under a rebate warranty ⋮ Periodic Replacement Policies and Comparisons with Their Extended Policies ⋮ Number-dependent replacement model with random lead-time for systems under maintenance continuously ⋮ Analytical properties of an imperfect repair model and application in preventive maintenance scheduling ⋮ Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time ⋮ A Generalized Periodic Preventive Maintenance Model With Virtual Age for a System Subjected to Shocks ⋮ An Optimal Age for Preventive Replacement Under Fully Renewing Combination Free Replacement and Pro Rata Warranty ⋮ Two shock and wear systems under repair standing a finite number of shocks ⋮ Optimal maintenance policy for multicomponent systems with periodic and opportunistic inspections and preventive replacements ⋮ Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks ⋮ Optimal replacement period of a two-unit system with failure rate interaction and external shocks ⋮ Optimal age-replacement policy for repairable products under renewing free-replacement warranty ⋮ Poisson Lindley process and its main properties ⋮ A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul ⋮ Extended optimal replacement policy for a two-unit system with failure rate interaction and external shocks ⋮ Specifying measurement errors for required lifetime estimation performance
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Extended optimal replacement model with random minimal repair costs
- A generalized age and block replacement of a system subject to shocks
- A generalized model for determining optimal number of minimal repairs before replacement
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- Optimum Preventive Maintenance Policies
- Periodic replacement when minimal repair costs vary with time
- Periodic Replacement with Increasing Minimal Repair Costs at Failure
- Optimum replacement of a system subject to shocks
- A non-Markov model for the optimum replacement of self-repairing systems subject to shocks
- Optimal Number of Minimal Repairs before Replacement
- The Age Replacement Problem with Minimal Repair and Random Repair Costs
- GENERALIZED MODELS FOR DETERMINING OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT
- Periodic replacement with minimal repair at failure and general cost function
- An Optimal Decision Rule for Repair vs Replacement
- Extended optimal age replacement policy with minimal repair
- Optimal number of minor failures before replacement
- An Age Replacement Policy with Minimal Repair Cost Limit
- Optimal number of minimal repairs before replacement of a system subject to shocks
This page was built for publication: Extended optimal age-replacement policy with minimal repair of a system subject to shocks