A multi-objective production scheduling case study solved by simulated annealing

From MaRDI portal
Publication:863984

DOI10.1016/j.ejor.2005.03.073zbMath1163.90498OpenAlexW2151576596MaRDI QIDQ863984

Philippe Fortemps, Jacques jun. Teghem, Taïcir Loukil

Publication date: 12 February 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.073




Related Items (14)



Cites Work


This page was built for publication: A multi-objective production scheduling case study solved by simulated annealing