A multi-objective production scheduling case study solved by simulated annealing
From MaRDI portal
Publication:863984
DOI10.1016/j.ejor.2005.03.073zbMath1163.90498OpenAlexW2151576596MaRDI QIDQ863984
Philippe Fortemps, Jacques jun. Teghem, Taïcir Loukil
Publication date: 12 February 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.073
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (14)
A genetic algorithm for flexible job shop scheduling with fuzzy processing time ⋮ Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics ⋮ Optimization of the integrated problem of employee timetabling and job shop scheduling ⋮ Clustering and selecting suppliers based on simulated annealing algorithms ⋮ Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times ⋮ Decentralized operation strategies for an integrated building energy system using a memetic algorithm ⋮ Cultural-based genetic tabu algorithm for multiobjective job shop scheduling ⋮ Multiobjective optimization for complex flexible job-shop scheduling problems ⋮ Location of facility based on simulated annealing and ``ZKW algorithms ⋮ A hybrid approach for supplier cluster analysis ⋮ Mathematical models for job-shop scheduling problems with routing and process plan flexibility ⋮ Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility ⋮ A research survey: review of flexible job shop scheduling techniques ⋮ Multi-Objective Optimization and Multi-Attribute Decision Making for a Novel Batch Scheduling Problem Based on Mould Capabilities
Cites Work
- An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
- An interactive heuristic method for multi-objective combinatorial optimization
- Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
- Solving multi-objective production scheduling problems using metaheuristics
- Performance of the MOSA method for the bicriteria assignment problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- MOSA method: a tool for solving multiobjective combinatorial optimization problems
- Handbook of metaheuristics
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: A multi-objective production scheduling case study solved by simulated annealing