A genetic algorithm for resource investment problem with discounted cash flows
From MaRDI portal
Publication:865553
DOI10.1016/j.amc.2006.05.118zbMath1112.90035OpenAlexW2071555327MaRDI QIDQ865553
Amir Abbas Najafi, Seyed Taghi A. Niaki
Publication date: 19 February 2007
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2006.05.118
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (8)
Statistical design of genetic algorithms for combinatorial optimization problems ⋮ The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds ⋮ Resource tardiness weighted cost minimization in project scheduling ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem ⋮ A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations ⋮ Optimization of a highway project planning using a modified genetic algorithm ⋮ A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties
Cites Work
- The scheduling of activities to maximize the net present value of projects
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling a project to maximize its net present value: An integer programming approach
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- On modelling payments in projects
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Performance of the heuristic procedures for constrained projects with progress payments
- Heuristic scheduling of resource-constrained projects with cash flows
- Optimization guided lower and upper bounds for the resource investment problem
- Cash Flows in Networks
- The payment scheduling problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project Scheduling with Discounted Cash Flows and Progress Payments
- The resource renting problem subject to temporal constraints
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
- A review of the contribution of operational research to project management
This page was built for publication: A genetic algorithm for resource investment problem with discounted cash flows