A multi-objective particle swarm for a flow shop scheduling problem
DOI10.1007/s10878-006-9015-7zbMath1112.90037OpenAlexW2012700644MaRDI QIDQ867030
S. M. Mirghorbani, Alireza Rahimi-Vahed
Publication date: 14 February 2007
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-006-9015-7
Bi-criteria flow shop scheduling problemMulti-objective genetic algorithmMulti-objective particle swarmPermutation flow shop
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (14)
Uses Software
Cites Work
- Unnamed Item
- Minimizing total completion time in a two-machine flow shop with deteriorating jobs
- The job shop scheduling problem: Conventional and new solution techniques
- A tabu search approach for the flow shop scheduling problem
- Solving the continuous flow-shop scheduling problem by metaheuristics.
- Minimizing the weighted number of tardy jobs on a two-machine flow shop.
- A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
- The two-machine flow-shop problem with weighted late work criterion and common due date
- A bicriteria approach to the two-machine flow shop scheduling problem
- Two-machine flow shop scheduling with two criteria: maximum earliness and makespan
- A neuro-tabu search heuristic for the flow shop scheduling problem
- Solving multi-objective production scheduling problems using metaheuristics
- A comparison of neighborhood search techniques for multi-objective combinatorial problems
- A similar particle swarm optimization algorithm for permutation flowshop scheduling to minimize makespan
- Some local search algorithms for no-wait flow-shop problem with makespan criterion
- ``MOSS multiobjective scatter search applied to nonlinear multiple criteria optimization
- Some aspects of scatter search in the flow-shop problem
- Flowshop scheduling research after five decades
- Multiobjective Optimization
- KI 2005: Advances in Artificial Intelligence
- Genetic local search for multi-objective combinatorial optimization
- Minimizing tardiness in a two-machine flow-shop
This page was built for publication: A multi-objective particle swarm for a flow shop scheduling problem