Simple heuristics for scheduling with limited intermediate storage
From MaRDI portal
Publication:868994
DOI10.1016/J.COR.2005.09.004zbMath1144.90404OpenAlexW2029789803MaRDI QIDQ868994
Publication date: 26 February 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.09.004
Related Items (7)
Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines ⋮ On a borderline between the NP-hard and polynomial-time solvable cases of the flow shop with job-dependent storage requirements ⋮ Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications ⋮ A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements ⋮ Scheduling batches in flowshop with limited buffers in the shampoo industry ⋮ Production planning with load dependent lead times: An update of research ⋮ Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements
Cites Work
- Unnamed Item
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Heuristics for multimode scheduling problems with dedicated resources
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- A genetic algorithm for flowshop sequencing
- Flow-shop problems with intermediate buffers
- A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities.
- Project scheduling with inventory constraints
- Project scheduling under limited resources. Models, methods, and applications
- Benchmarks for basic scheduling problems
- Optimal two- and three-stage production schedules with setup times included
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Some Numerical Experiments for an M × J Flow Shop and its Decision-Theoretical Aspects
- Flowshop sequencing problems with limited buffer storage
- An Adaptable Scheduling Algorithm for Flexible Flow Lines
- Flowshop scheduling with limited temporary storage
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- Note—Sequencing with Finite Intermediate Storage
- Ordonnancements à contraintes disjonctives
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
This page was built for publication: Simple heuristics for scheduling with limited intermediate storage