A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
DOI10.1016/j.ejor.2006.04.024zbMath1114.90334OpenAlexW2050606261MaRDI QIDQ869182
Kosuke Kato, Masatoshi Sakawa, Amir Azaron, Cahit Perkgoz, Hideki Katagiri
Publication date: 26 February 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://ir.lib.hiroshima-u.ac.jp/files/public/2/20748/20141016135443233629/EJOR_180-1_292.pdf
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Queues and service in operations research (90B22) Production models (90B30)
Related Items (6)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Modelling complex assemblies as a queueing network for lead time control
- Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
- Survey of scheduling research involving due date determination decisions
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- Fuzzy programming for multiobjective 0-1 programming problems through revised genetic algorithms
- A Markovian single server with upstream job and downstream demand arrival stream
- Distribution function of the shortest path in networks of queues
- Genetic algorithms with double strings for 0-1 programming problems
- Performance analysis and buffer allocations in some open assembly systems.
- Performance analysis of a kitting process in stochastic assembly systems
- Due Date Assignment for Production Systems
- Steady state waiting time in a multicenter job shop
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Assembly-like queues
This page was built for publication: A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms