A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
From MaRDI portal
Publication:872245
DOI10.1016/j.ejor.2006.03.056zbMath1121.90062OpenAlexW2083150960MaRDI QIDQ872245
Shahram Shadrokh, Fereydoon Kianfar
Publication date: 27 March 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.03.056
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (22)
A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ Multi-mode resource availability cost problem with recruitment and release dates for resources ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ A genetic algorithm for resource investment problem with discounted cash flows ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems ⋮ A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations ⋮ The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds ⋮ Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure ⋮ An effective heuristic for project scheduling with resource availability cost ⋮ Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm ⋮ An exact algorithm for minimizing resource availability costs in project scheduling ⋮ Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem ⋮ Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations ⋮ A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING ⋮ A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations ⋮ A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties ⋮ Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Optimization guided lower and upper bounds for the resource investment problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- The resource renting problem subject to temporal constraints
This page was built for publication: A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty