Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem

From MaRDI portal
Publication:872264

DOI10.1016/j.ejor.2006.05.036zbMath1121.90064OpenAlexW2133204269MaRDI QIDQ872264

Hossein Soroush

Publication date: 27 March 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.05.036




Related Items (17)

Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing timesDistributionally robust single machine scheduling with the total tardiness criterionHybrid flow shop scheduling with sequence dependent family setup time and uncertain due datesSolving a stochastic single machine problem with initial idle time and quadratic objectiveA survey of single machine scheduling to minimize weighted number of tardy jobsA stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costsSingle machine scheduling with release dates: a distributionally robust approachSignificantly improved dominance relation for no-wait flowshop scheduling problems with uncertain setup timesTwo-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum latenessMinimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup timesDistributionally robust single machine scheduling with risk aversionRobust scheduling on a single machine to minimize total flow timeTwo-machine flowshop scheduling problem with bounded processing times to minimize total completion timeA polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing timesStochastic single machine scheduling problem as a multi-stage dynamic random decision processTarget-based distributionally robust optimization for single machine schedulingBi-objective single machine scheduling problem with stochastic processing times



Cites Work


This page was built for publication: Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem