Minimizing total earliness and tardiness on a single machine using a hybrid heuristic

From MaRDI portal
Publication:878591

DOI10.1016/j.cor.2005.11.021zbMath1185.90088OpenAlexW2105938641MaRDI QIDQ878591

Rym M'Hallah

Publication date: 26 April 2007

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2005.11.021




Related Items

RETRACTED ARTICLE: Approach towards problem solving on single machine scheduling with unequal release dates and learning effectAnt colony systems for the single-machine total weighted earliness tardiness scheduling problemMinimization of the total weighted tardiness on a single machine scheduling problem with a position based learning effect and unequal release datesMinimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraintSingle machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardinessA hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setupsGenetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobsOrder acceptance using genetic algorithmsAn uncertain programming model for single machine scheduling problem with batch deliveryAn uncertain parallel machine problem with deterioration and learning effectA unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problemsNew solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobsBi-objective single machine scheduling problem with stochastic processing timesMinimizing earliness and tardiness costs in stochastic scheduling



Cites Work


This page was built for publication: Minimizing total earliness and tardiness on a single machine using a hybrid heuristic