Simultaneous optimization of classical objectives in JIT scheduling
From MaRDI portal
Publication:879282
DOI10.1016/j.ejor.2006.07.019zbMath1128.90526OpenAlexW2015336135MaRDI QIDQ879282
Vassilissa Lebacque, Vincent Jost, Nadia Brauner
Publication date: 11 May 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.07.019
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (4)
The multi-objective assembly line worker integration and balancing problem of type-2 ⋮ Unnamed Item ⋮ Solving symmetric mixed-model multi-level just-in-time scheduling problems ⋮ The product rate variation problem and its relevance in real world mixed-model assembly lines
Cites Work
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process
- The maximum deviation just-in-time scheduling problem.
- Minimizing variation of production rates in just-in-time systems: A survey
- A framework for the complexity of high-multiplicity scheduling problems
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- A Computational Analysis Of Balanced Jit Optimization Algorithms
- On The Relations Between Optimal Solutions For Different Types OfMin-SumBalanced Jit Optimisation Problems
This page was built for publication: Simultaneous optimization of classical objectives in JIT scheduling