Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives
From MaRDI portal
Publication:879520
DOI10.1016/J.AMC.2006.05.185zbMath1122.90032OpenAlexW2092008747MaRDI QIDQ879520
Yakup Kara, Ahmet Peker, Uğur Özcan
Publication date: 14 May 2007
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2006.05.185
Related Items (7)
Balancing and sequencing of parallel mixed-model assembly lines ⋮ Balancing parallel assembly lines with precise and fuzzy goals ⋮ Assembly line balancing: what happened in the last fifteen years? ⋮ Balancing of parallel U-shaped assembly lines ⋮ An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Evaluation of mixed-model U-line operational designs
Cites Work
- Optimization by Simulated Annealing
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- An analytic framework for sequencing mixed model assembly lines
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- The mixed-model U-line balancing problem
- Revisiting the mixed-model multi-level just-in-time scheduling problem
- Balancing and sequencing manual mixed-model assembly lines
- A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
- Mixed Model Line Balancing with Smoothed Station Assignments
- Production-Line Balances for Mixed-Model Lines
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
This page was built for publication: Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives