Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

On the connection between a cyclic job shop and a reentrant flow shop scheduling problem

From MaRDI portal
Publication:880555
Jump to:navigation, search

DOI10.1007/S10951-006-7041-ZzbMath1154.90492OpenAlexW2126394800MaRDI QIDQ880555

Zhihui Xue, George Steiner

Publication date: 15 May 2007

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-006-7041-z


zbMATH Keywords

MakespanJob shopAlgorithms and complexityCycle timeReentrant flow shop


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

New multi-objective method to solve reentrant hybrid flow shop scheduling problem




Cites Work

  • V-shop scheduling
  • A heuristic algorithm for two-machine re-entrant shop scheduling
  • The complexity of cyclic shop scheduling problems
  • Performance Measures and Schedules in Periodic Job Shops
  • Minimizing Makespan in a Class of Reentrant Shops




This page was built for publication: On the connection between a cyclic job shop and a reentrant flow shop scheduling problem

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:880555&oldid=12835450"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 15:49.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki