Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Single machine batch scheduling problem with family setup times and release dates to minimize makespan

From MaRDI portal
Publication:880565
Jump to:navigation, search

DOI10.1007/s10951-006-8776-2zbMath1154.90507OpenAlexW1976300665MaRDI QIDQ880565

N. E. Zubov

Publication date: 15 May 2007

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/10397/1142

zbMATH Keywords

SchedulingRelease datesBatchingMakespanFamily


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

Single-machine scheduling with advanced process control constraints ⋮ A survey of scheduling problems with setup times or costs ⋮ Scheduling batches in flowshop with limited buffers in the shampoo industry ⋮ A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups ⋮ Vehicle scheduling with combinable delivery and pickup operations



Cites Work

  • Batch scheduling to minimize maximum lateness
  • Scheduling with batching: A review
  • The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hard
  • Complexity of Task Sequencing with Deadlines, Set-Up Times and Changeover Costs
  • On the Complexity of Scheduling with Batch Setup Times
  • Unnamed Item
  • Unnamed Item
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:880565&oldid=12835494"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 16:49.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki