Two-machine flow shop problems with a single server
From MaRDI portal
Publication:880567
DOI10.1007/s10951-006-8787-zzbMath1154.90470OpenAlexW2081097282MaRDI QIDQ880567
Brian Rodrigues, Andrew E. B. Lim, Cai-Xia Wang
Publication date: 15 May 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-006-8787-z
Related Items (2)
Two-machine open shop problem with a single server and set-up time considerations ⋮ Parallel machine scheduling with multiple unloading servers
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- Some efficient heuristic methods for the flow shop sequencing problem
- The two-machine sequence dependent flowshop scheduling problem
- A new heuristic method for the flow shop sequencing problem
- Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
- Modified simulated annealing algorithms for the flow shop sequencing problem
- A tabu search approach for the flow shop scheduling problem
- One-operator-two-machine flowshop scheduling with setup and dismounting times
- Complexity results for flow-shop problems with a single server
- Optimal two- and three-stage production schedules with setup times included
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Tabu Search—Part I
- Tabu Search—Part II
- The Complexity of Flowshop and Jobshop Scheduling
- Parallel Taboo Search Techniques for the Job Shop Scheduling Problem
- Scheduling for parallel dedicated machines with a single server
- Scheduling parallel machines with a single server: Some solvable cases and heuristics
This page was built for publication: Two-machine flow shop problems with a single server