Applying fuzzy method for measuring criticality in project network
From MaRDI portal
Publication:881877
DOI10.1016/j.ins.2007.01.035zbMath1124.90013OpenAlexW1997525182MaRDI QIDQ881877
Publication date: 18 May 2007
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2007.01.035
Related Items (15)
Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision making ⋮ Fuzzy finish time modeling for project scheduling ⋮ Fuzzy-probabilistic PERT ⋮ A fuzzy time-dependent project scheduling problem ⋮ Solution of interval PERT/CPM network problems by a simplified tabular method ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network ⋮ Three-objective fuzzy chance-constrained programming model for multiproject and multi-item investment combination ⋮ A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network ⋮ Project risk management from the bottom-up: activity risk index ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ Using stochastic decision networks to assess costs and completion times of refurbishment work in construction ⋮ Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks ⋮ Using metric distance ranking method to find intuitionistic fuzzy critical path
Cites Work
- Comparison of fuzzy numbers based on the probability measure of fuzzy events
- Fuzzy sets and systems. Theory and applications
- The use of fuzzy variables in PERT
- Fuzzy multiple attribute decision making. Methods and applications. In collaboration with Frank P. Hwang
- Path critical index and activity critical index in PERT networks
- A new structural mechanism for reducibility of stochastic PERT networks
- On latest starting times and floats in activity networks with ill-known durations
- Application of fuzzy distributions on project management
- A multi-objective resource allocation problem in PERT networks
- Toward a generalized theory of uncertainty (GTU) -- an outline
- A genetic algorithm approach for the time-cost trade-off in PERT networks
- Fuzzy sets
- An approximation of the activity duration distribution in PERT.
- Critical path analysis in the network with fuzzy activity times
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Applying fuzzy method for measuring criticality in project network