Considering scheduling and preventive maintenance in the flowshop sequencing problem
From MaRDI portal
Publication:883296
DOI10.1016/j.cor.2005.12.007zbMath1128.90031OpenAlexW2033437970MaRDI QIDQ883296
J. Carlos García-Díaz, Rubén Ruiz, Concepción Maroto
Publication date: 4 June 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.12.007
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (17)
Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study ⋮ Digital twin-enabled dynamic scheduling with preventive maintenance using a double-layer Q-learning algorithm ⋮ Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate ⋮ Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem ⋮ Multi-machine preventive maintenance scheduling with imperfect interventions: a restless bandit approach ⋮ Minimizing total completion time on a single machine with a flexible maintenance activity ⋮ Data-driven predictive maintenance policy based on multi-objective optimization approaches for the component repairing problem ⋮ A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines ⋮ A review and classification on distributed permutation flowshop scheduling problems ⋮ A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach ⋮ Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach ⋮ A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems ⋮ Recursive operation time maximization model for the maintenance of power generation equipment ⋮ Two-machine flow shop scheduling integrated with preventive maintenance planning ⋮ Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics ⋮ SINGLE-MACHINE MULTIPLE-RECIPE PREDICTIVE MAINTENANCE ⋮ Production, maintenance and resource scheduling: a review
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A new heuristic method for the flow shop sequencing problem
- A fast tabu search algorithm for the permutation flow-shop problem
- A contribution to the stochastic flow shop scheduling problem.
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs.
- A comprehensive review and evaluation of permutation flowshop heuristics
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- Optimal two- and three-stage production schedules with setup times included
- Optimum Preventive Maintenance Policies
- A repair replacement model
- Optimal strategies for some repair replacement models
- A survey of maintenance models: The control and surveillance of deteriorating systems
- On general routing problems
- An Evaluation of Flow Shop Sequencing Heuristics
- Production and maintenance integrated planning
- Maintenance Policies for Stochastically Failing Equipment: A Survey
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- Single-machine scheduling with maintenance and repair rate-modifying activities
This page was built for publication: Considering scheduling and preventive maintenance in the flowshop sequencing problem