Considering scheduling and preventive maintenance in the flowshop sequencing problem

From MaRDI portal
Publication:883296

DOI10.1016/j.cor.2005.12.007zbMath1128.90031OpenAlexW2033437970MaRDI QIDQ883296

J. Carlos García-Díaz, Rubén Ruiz, Concepción Maroto

Publication date: 4 June 2007

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2005.12.007




Related Items (17)

Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational studyDigital twin-enabled dynamic scheduling with preventive maintenance using a double-layer Q-learning algorithmScheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rateBi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problemMulti-machine preventive maintenance scheduling with imperfect interventions: a restless bandit approachMinimizing total completion time on a single machine with a flexible maintenance activityData-driven predictive maintenance policy based on multi-objective optimization approaches for the component repairing problemA two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machinesA review and classification on distributed permutation flowshop scheduling problemsA novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approachDeveloping a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approachA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsRecursive operation time maximization model for the maintenance of power generation equipmentTwo-machine flow shop scheduling integrated with preventive maintenance planningScheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristicsSINGLE-MACHINE MULTIPLE-RECIPE PREDICTIVE MAINTENANCEProduction, maintenance and resource scheduling: a review


Uses Software



Cites Work




This page was built for publication: Considering scheduling and preventive maintenance in the flowshop sequencing problem