Pareto minimizing total completion time and maximum cost with positional due indices
From MaRDI portal
Publication:888315
DOI10.1007/S40305-015-0083-1zbMath1327.90070OpenAlexW918221814MaRDI QIDQ888315
Publication date: 30 October 2015
Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40305-015-0083-1
Related Items (7)
Rescheduling with new orders and general maximum allowable time disruptions ⋮ Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices ⋮ Pareto optimal algorithms for minimizing total (weighted) completion time and maximum cost on a single machine ⋮ Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints ⋮ A note on competing-agent Pareto-scheduling ⋮ Single-machine scheduling with positional due indices and positional deadlines ⋮ ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
Cites Work
- Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty
- Solving a bicriterion scheduling problem
- A note on Pareto minimizing total completion time and maximum cost
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
- Multicriteria scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
This page was built for publication: Pareto minimizing total completion time and maximum cost with positional due indices