Two-machine interval shop scheduling with time lags
From MaRDI portal
Publication:892834
DOI10.1007/S10951-013-0336-YzbMath1328.90063OpenAlexW1979469095MaRDI QIDQ892834
Xiandong Zhang, Steef L. van de Velde
Publication date: 12 November 2015
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0336-y
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Polynomial-time approximation schemes for scheduling problems with time lags
- Scheduling jobs with fixed start and end times
- A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop
- Exact and approximation algorithms for the operational fixed interval scheduling problem
- Minimizing the weighted number of tardy jobs on a two-machine flow shop.
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Two-machine open shop scheduling with special transportation times
- Heuristics for a coupled-operation scheduling problem
- Interval scheduling: A survey
- Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem
- The complexity of satisfiability problems
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- The complexity of theorem-proving procedures
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Hard tiling problems with simple tiles
This page was built for publication: Two-machine interval shop scheduling with time lags