Financing and reliability analysis for schedules in the project calendar planning problem
From MaRDI portal
Publication:893924
DOI10.1134/S0005117914070054zbMath1325.93052MaRDI QIDQ893924
E. A. Kazakovtseva, Vladimir V. Servakh
Publication date: 23 November 2015
Published in: Automation and Remote Control (Search for Journal in Brave)
Estimation and detection in stochastic control theory (93E10) Stochastic scheduling theory in operations research (90B36) Stochastic systems in control theory (general) (93E03) Economic models of real-world systems (e.g., electricity markets, etc.) (91B74)
Related Items (2)
Complexity of the project scheduling problem with credits ⋮ Minimizing the payments and borrower risk in a mortgage
Cites Work
- The scheduling of activities to maximize the net present value of projects
- On scheduling credited projects
- Scheduling a project to maximize its net present value: An integer programming approach
- Critical-Path Planning and Scheduling: Mathematical Basis
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Cash Flows in Networks
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Financing and reliability analysis for schedules in the project calendar planning problem