Lexicographic solution of two-objective project planning problem under constrained reliability index
From MaRDI portal
Publication:895303
DOI10.1134/S1064230714040133zbMath1327.93301OpenAlexW2160818891MaRDI QIDQ895303
Publication date: 27 November 2015
Published in: Journal of Computer and Systems Sciences International (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1134/s1064230714040133
Management decision making, including multiple objectives (90B50) Application models in control theory (93C95) Stochastic systems in control theory (general) (93E03)
Related Items (2)
The cross-impact analysis of innovative projects in a portfolio ⋮ Selection of priority areas in research and development
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A heuristic method for RCPSP with fuzzy activity times
- Cyclical games with prohibitions
- Regularized linearization method with errors in the initial data
- Regularized proximal method for minimization problems with inaccurate initial data
- Maximin dynamical probabilistic model of design control
- A two-step regularized linearization method for solving minimization problems.
- Volatility estimation for stochastic project value models
- Optimization of schedules with precedence logical conditions
- Method of fuzzy critical path for network planning and control over projects based on soft computations
- How real option disinvestment flexibility augments project NPV
- Critical-Path Planning and Scheduling: Mathematical Basis