Parametric precedence relations in single machine scheduling
From MaRDI portal
Publication:916560
DOI10.1016/0167-6377(90)90053-8zbMath0703.90045OpenAlexW2059232429MaRDI QIDQ916560
Publication date: 1990
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(90)90053-8
single machine schedulingbranch and bound algorithmprecedence relationcompletion timesadjacent precedence matrixquadratic criterion
Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
The weighted common due date single machine scheduling problem revisited ⋮ Optimal sequences in stochastic single machine shops ⋮ Generalized pairwise interchanges and machine scheduling ⋮ Solution of the generalized Townsend single machine scheduling model
Cites Work
- Minimizing mean absolute deviation of completion times about a common due date
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem
- The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution
- Note—On the Single Machine Scheduling Problem with Quadratic Penalty Function of Completion Times: An Improved Branching Procedure