A production planning problem in FMS
From MaRDI portal
Publication:917423
DOI10.1007/BF02096599zbMath0704.90039MaRDI QIDQ917423
Laureano Fernando Escudero Bueno
Publication date: 1989
Published in: Annals of Operations Research (Search for Journal in Brave)
Programming involving graphs or networks (90C35) Numerical mathematical programming methods (65K05) Applications of mathematical programming (90C90) Production models (90B30) Combinatorial optimization (90C27) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (3)
CMIT, capacitated multi-level implosion tool ⋮ A Lagrangian relax-and-cut approach for the sequential ordering problem with precedence relationships ⋮ Strategies for LP-based solving a general class of scheduling problems
Cites Work
- The optimality of balancing workloads in certain types of flexible manufacturing systems
- Heuristics and reduction methods for multiple constraints 0-1 linear programming problems
- A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- An inexact algorithm for the sequential ordering problem
- A Cutting Plane Algorithm for the Linear Ordering Problem
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Solving 0-1 Integer Programming Problems Arising from Large Scale Planning Models
- Solving Large-Scale Zero-One Linear Programming Problems
- A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems
- An Adaptable Scheduling Algorithm for Flexible Flow Lines
- A restricted Lagrangean approach to the traveling salesman problem
- Solving Mixed Integer Programming Problems Using Automatic Reformulation
- Algorithm 595: An Enumerative Algorithm for Finding Hamiltonian Circuits in a Directed Graph
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: A production planning problem in FMS