Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

On the continuous working problem

From MaRDI portal
Publication:917431
Jump to:navigation, search

DOI10.1016/0166-218X(90)90109-PzbMath0704.90047OpenAlexW2020692528MaRDI QIDQ917431

Ruay-Shiung Chang, Richard Chia-Tung Lee

Publication date: 1990

Published in: Discrete Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0166-218x(90)90109-p


zbMATH Keywords

NP-completeminimum makespancontinuous working problemmaximum working timeminimum resting time


Mathematics Subject Classification ID

Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Computational methods for problems pertaining to operations research and mathematical programming (90-08)


Related Items (1)

On a scheduling problem where a job can be executed only by a limited number of processors



Cites Work

  • Complexity Results for Multiprocessor Scheduling under Resource Constraints
  • Experiments With a Multipurpose, Theorem-Proving Heuristic Program
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item


This page was built for publication: On the continuous working problem

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:917431&oldid=12881422"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 18:11.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki