Minimizing the number of tardy job units under release time constraints
From MaRDI portal
Publication:919993
DOI10.1016/0166-218X(90)90093-RzbMath0707.90049MaRDI QIDQ919993
Publication date: 1990
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Special problems of linear programming (transportation, multi-index, data envelopment analysis, etc.) (90C08) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (24)
Minimizing the weighted number of tardy task units ⋮ Scheduling High Multiplicity Jobs on Parallel Multi-Purpose Machines with Setup Times and Machine Available Times ⋮ An alternative approach for proving the NP-hardness of optimization problems ⋮ Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date ⋮ The assignment problem with nearly Monge arrays and incompatible partner indices ⋮ A single machine scheduling problem to minimize total early work ⋮ A survey of single machine scheduling to minimize weighted number of tardy jobs ⋮ Variable neighborhood search for the single machine scheduling problem to minimize the total early work ⋮ Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work ⋮ Single-machine preemptive scheduling with release dates involving the total weighted late work criterion ⋮ Scheduling on parallel identical machines with late work criterion: offline and online cases ⋮ Machine Speed Scaling by Adapting Methods for Convex Optimization with Submodular Constraints ⋮ Fast Divide-and-Conquer Algorithms for Preemptive Scheduling Problems with Controllable Processing Times – A Polymatroid Optimization Approach ⋮ A fast algorithm for constructing Monge sequences in transportation problems with forbidden arcs ⋮ Monge and feasibility sequences in general flow problems ⋮ Preemptive models of scheduling with controllable processing times and of scheduling with imprecise computation: a review of solution approaches ⋮ Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance ⋮ Multiplicity and complexity issues in contemporary production scheduling ⋮ Scheduling two agents with controllable processing times ⋮ Scheduling a proportionate flow shop of batching machines ⋮ Application of Submodular Optimization to Single Machine Scheduling with Controllable Processing Times Subject to Release Dates and Deadlines ⋮ Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works ⋮ A framework for the complexity of high-multiplicity scheduling problems ⋮ A polynomial algorithm for lot-size scheduling of two type tasks.
Cites Work
This page was built for publication: Minimizing the number of tardy job units under release time constraints