Minimizing the number of tardy job units under release time constraints

From MaRDI portal
Publication:919993

DOI10.1016/0166-218X(90)90093-RzbMath0707.90049MaRDI QIDQ919993

Ron Shamir, Dorit S. Hochbaum

Publication date: 1990

Published in: Discrete Applied Mathematics (Search for Journal in Brave)




Related Items (24)

Minimizing the weighted number of tardy task unitsScheduling High Multiplicity Jobs on Parallel Multi-Purpose Machines with Setup Times and Machine Available TimesAn alternative approach for proving the NP-hardness of optimization problemsMetaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due dateThe assignment problem with nearly Monge arrays and incompatible partner indicesA single machine scheduling problem to minimize total early workA survey of single machine scheduling to minimize weighted number of tardy jobsVariable neighborhood search for the single machine scheduling problem to minimize the total early workPareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late workSingle-machine preemptive scheduling with release dates involving the total weighted late work criterionScheduling on parallel identical machines with late work criterion: offline and online casesMachine Speed Scaling by Adapting Methods for Convex Optimization with Submodular ConstraintsFast Divide-and-Conquer Algorithms for Preemptive Scheduling Problems with Controllable Processing Times – A Polymatroid Optimization ApproachA fast algorithm for constructing Monge sequences in transportation problems with forbidden arcsMonge and feasibility sequences in general flow problemsPreemptive models of scheduling with controllable processing times and of scheduling with imprecise computation: a review of solution approachesMinimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenanceMultiplicity and complexity issues in contemporary production schedulingScheduling two agents with controllable processing timesScheduling a proportionate flow shop of batching machinesApplication of Submodular Optimization to Single Machine Scheduling with Controllable Processing Times Subject to Release Dates and DeadlinesSingle-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late worksA framework for the complexity of high-multiplicity scheduling problemsA polynomial algorithm for lot-size scheduling of two type tasks.



Cites Work


This page was built for publication: Minimizing the number of tardy job units under release time constraints