Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Almost nonpreemptive schedules

From MaRDI portal
Publication:922279
Jump to:navigation, search

DOI10.1007/BF02248592zbMath0709.90059OpenAlexW1968789037MaRDI QIDQ922279

Dominique de Werra

Publication date: 1990

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/bf02248592


zbMATH Keywords

flexible manufacturing systemstimetablinginterval coloringrenewable resourcestwo-phase methodchromatic schedulingline-perfect graphspreemptive and nonpreemptive scheduling


Mathematics Subject Classification ID

Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35)


Related Items (4)

Open shop scheduling with some additional constraints ⋮ On preemptive scheduling: A general setting for the two-phase method ⋮ Four decades of research on the open-shop scheduling problem to minimize the makespan ⋮ On the deficiency of bipartite graphs



Cites Work

  • On the two-phase method for preemptive scheduling
  • Open Shop Scheduling to Minimize Finish Time
  • Line perfect graphs
  • On line perfect graphs
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item


This page was built for publication: Almost nonpreemptive schedules

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:922279&oldid=12886526"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 18:20.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki