Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

The plant layout problem in automated manufacturing systems

From MaRDI portal
Publication:922290
Jump to:navigation, search

zbMath0709.90069MaRDI QIDQ922290

Ali S. Kiran, Panagiotis Kouvelis

Publication date: 1990

Published in: Annals of Operations Research (Search for Journal in Brave)


zbMATH Keywords

quadratic assignmentplant layoutautomated manufacturing system


Mathematics Subject Classification ID

Integer programming (90C10) Production models (90B30) Discrete location and assignment (90B80) Computational methods for problems pertaining to operations research and mathematical programming (90-08)


Related Items (4)

The multi-story space assignment problem ⋮ Single and multiple period layout models for automated manufacturing systems ⋮ Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem ⋮ Layout design for flexible manufacturing systems






This page was built for publication: The plant layout problem in automated manufacturing systems

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:922290&oldid=12886540"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 17:20.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki