On the geometry, preemptions and complexity of multiprocessor and shop scheduling
From MaRDI portal
Publication:940887
DOI10.1007/s10479-007-0266-1zbMath1151.90433OpenAlexW1979626969MaRDI QIDQ940887
Nodari Vakhania, Evgeny V. Shchepin
Publication date: 3 September 2008
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-007-0266-1
Related Items (9)
Parametric analysis of the quality of single preemption schedules on three uniform parallel machines ⋮ Schedules with a single preemption on uniform parallel machines ⋮ On the complexity of scheduling unrelated parallel machines with limited preemptions ⋮ On the complexity of constructing multiprocessor little-preemptive schedules ⋮ Research on permutation flow shop scheduling problems with general position-dependent learning effects ⋮ Some results of the worst-case analysis for flow shop scheduling with a learning effect ⋮ Four decades of research on the open-shop scheduling problem to minimize the makespan ⋮ A note on the proof of the complexity of the little-preemptive open-shop problem ⋮ Preemptive and non-preemptive scheduling on two unrelated parallel machines
Cites Work
- Unnamed Item
- Approximation algorithms for scheduling unrelated parallel machines
- Analysis of a linear programming heuristic for scheduling unrelated parallel machines
- The complexity of cyclic shop scheduling problems
- Little-preemptive scheduling on unrelated processors
- An optimal rounding gives a better approximation for scheduling unrelated machines
- Scheduling with Deadlines and Loss Functions
- An Efficient Optimal Algorithm for the Two-Machines Unit-Time Jobshop Schedule-Length Problem
- Open Shop Scheduling to Minimize Finish Time
- Preemptive Scheduling of Uniform Processor Systems
- Flowshop and Jobshop Schedules: Complexity and Approximation
- On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming
This page was built for publication: On the geometry, preemptions and complexity of multiprocessor and shop scheduling