A zero-inventory production and distribution problem with a fixed customer sequence

From MaRDI portal
Publication:940901

DOI10.1007/s10479-007-0272-3zbMath1152.90301OpenAlexW2092411961MaRDI QIDQ940901

B. E. Eshmatov

Publication date: 3 September 2008

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10479-007-0272-3




Related Items (17)

A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chainsMixed integer formulations for a coupled lot-scheduling and vehicle routing problem in furniture settingsAn exact approach based on a new pseudo-polynomial network flow model for integrated planning and schedulingSupply chain batching problem with identical orders and lifespanIntegrated production and transportation scheduling with order-dependent inventory holding costsHyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production qualityAn improved memetic algorithm for integrated production scheduling and vehicle routing decisionsCoordinated scheduling of production and delivery with production window and delivery capacity constraintsA review on integrated scheduling and outbound vehicle routing problemsA decentralized production–distribution scheduling problem: Solution and analysisComplexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequenceFinding efficient make-to-order production and batch delivery schedulesOptimization model for a production, inventory, distribution and routing problem in small furniture companiesIntegrated scheduling of production and distribution with release dates and capacitated deliveriesIntegrated production and distribution scheduling with lifespan constraintsIntegrated Production Scheduling and Delivery Routing: Complexity Results and Column GenerationThe mobile production vehicle routing problem: using 3D printing in last mile distribution


Uses Software


Cites Work


This page was built for publication: A zero-inventory production and distribution problem with a fixed customer sequence