Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
From MaRDI portal
Publication:941559
DOI10.1016/J.COR.2006.08.016zbMath1179.90160OpenAlexW2006358835MaRDI QIDQ941559
Gerardo Minella, Eva Vallada, Rubén Ruiz
Publication date: 1 September 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2006.08.016
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (35)
Total tardiness minimization in permutation flowshop with deterioration consideration ⋮ New hard benchmark for flowshop scheduling problems minimising makespan ⋮ Hybrid flexible flowshop problems: models and solution methods ⋮ Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness ⋮ Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times ⋮ NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness ⋮ Reduction of permutation flowshop problems to single machine problems using machine dominance relations ⋮ Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows ⋮ A beam-search-based constructive heuristic for the PFSP to minimise total flowtime ⋮ Efficient non-population-based algorithms for the permutation flowshop scheduling problem with makespan minimisation subject to a maximum tardiness ⋮ Efficient constructive and composite heuristics for the permutation flowshop to minimise total earliness and tardiness ⋮ Speeding up local search for the insert neighborhood in the weighted tardiness permutation flowshop problem ⋮ Just-in-time scheduling for a distributed concrete precast flow shop system ⋮ Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem ⋮ Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective ⋮ A review and classification on distributed permutation flowshop scheduling problems ⋮ Evaluating the impact of grammar complexity in automatic algorithm design ⋮ A mixed integer formulation and an efficient metaheuristic for the unrelated parallel machine scheduling problem: total tardiness minimization ⋮ Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization ⋮ A hybrid TP+PLS algorithm for bi-objective flow-shop scheduling problems ⋮ A two-machine flowshop scheduling problem with precedence constraint on two jobs ⋮ Minimizing total tardiness in no-wait flowshops ⋮ Bicriterion optimization for flow shop with a learning effect subject to release dates ⋮ Automatic design of hybrid stochastic local search algorithms for permutation flowshop problems ⋮ ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness ⋮ Cooperative metaheuristics for the permutation flowshop scheduling problem ⋮ Heuristics for a flowshop scheduling problem with stepwise job objective function ⋮ Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness ⋮ A cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshop ⋮ Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion ⋮ Flow shop scheduling problem with position-dependent processing times ⋮ Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling ⋮ Simulation Optimization for MRO Systems Operations ⋮ The distributed permutation flowshop scheduling problem ⋮ Near-optimal heuristics for just-in-time jobs maximization in flow shop scheduling
Cites Work
- Unnamed Item
- Scheduling flow shops using differential evolution algorithm
- A branch and bound algorithm to minimize the total tardiness for \(m\)-machine permutation flowshop problems
- The two-machine flowshop scheduling problem with total tardiness
- A new heuristic method for the flow shop sequencing problem
- Minimizing total tardiness in permutation flowshops
- Restricted neighborhood in the tabu search for the flowshop problem
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- An SA/TS mixture algorithm for the scheduling tardiness problem
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
- Tabu search for total tardiness minimization in flowshop scheduling problems
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
- A comprehensive review and evaluation of permutation flowshop heuristics
- A decomposition algorithm for the single machine total tardiness problem
- Benchmarks for basic scheduling problems
- Note on minimizing total tardiness in a two-machine flowshop
- Minimizing Total Tardiness on One Machine is NP-Hard
- Measuring the Quality of Approximate Solutions to Zero-One Programming Problems
- Focused Scheduling in Proportionate Flowshops
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- On general routing problems
- A Survey of Scheduling Rules
- Two-machine flowshop scheduling to minimize total tardiness
- Scheduling in flowshops to minimize total tardiness of jobs
- The Total Tardiness Problem: Review and Extensions
- Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- Minimizing tardiness in a two-machine flow-shop
This page was built for publication: Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics