Determining economic manufacturing quantity for an unreliable manufacturing system in discrete time setting
From MaRDI portal
Publication:948853
DOI10.1504/IJOR.2008.019168zbMath1177.90213OpenAlexW2003311434MaRDI QIDQ948853
Bibhas Chandra Giri, Tadashi Dohi
Publication date: 15 October 2008
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2008.019168
optimal production policydiscrete failure distributionmachine failuremachine repairrepair time distribution
Related Items (1)
This page was built for publication: Determining economic manufacturing quantity for an unreliable manufacturing system in discrete time setting