Analysis, modeling and solution of the concrete delivery problem
From MaRDI portal
Publication:954932
DOI10.1016/J.EJOR.2007.11.011zbMath1179.90120OpenAlexW2046727938MaRDI QIDQ954932
Erwin Pesch, Lasse Asbach, Ulrich Dorndorf
Publication date: 18 November 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.11.011
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Traffic problems in operations research (90B20)
Related Items (6)
The concrete delivery problem ⋮ An adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronization ⋮ Integer linear programming models for a cement delivery problem ⋮ Resources synchronization in a full truckload pickup and delivery problem: an exact approach ⋮ Hybridization of very large neighborhood search for ready-mixed concrete delivery problems ⋮ A truck scheduling problem arising in intermodal container transportation
Cites Work
- Unnamed Item
- Unnamed Item
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete
- Towards a decision support system for the ready concrete distribution system: a case of a Greek company.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Record breaking optimization results using the ruin and recreate principle
- OR PRACTICE—The Dance of the Thirty-Ton Trucks: Dispatching and Scheduling in a Dynamic Environment
This page was built for publication: Analysis, modeling and solution of the concrete delivery problem