Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
From MaRDI portal
Publication:955622
DOI10.1016/j.cor.2007.11.006zbMath1157.90420OpenAlexW2040369880MaRDI QIDQ955622
Publication date: 20 November 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2007.11.006
simulationextended object-oriented Petri netsmultiple-objective schedulingreal-time dispatchingsemiconductor manufacturing system
Related Items (3)
A novel approach to hedge and compensate the critical dimension variation of the developed-and-etched circuit patterns for yield enhancement in semiconductor manufacturing ⋮ Scheduling algorithms for a semiconductor probing facility ⋮ Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry
Cites Work
This page was built for publication: Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system