Job scheduling and management of wearing tools with stochastic tool lifetimes
From MaRDI portal
Publication:955695
DOI10.1007/s10696-008-9043-yzbMath1147.90344OpenAlexW2060031413MaRDI QIDQ955695
Olli S. Nevalainen, Mika Hirvikorpi, Timo Knuutila, Timo Leipaelae
Publication date: 20 November 2008
Published in: International Journal of Flexible Manufacturing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-008-9043-y
Related Items (1)
Cites Work
- Single machine flow-time scheduling with a single breakdown
- Optimal solutions for the machining economics problem with stochastically distributed tool lives
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
- Machine scheduling with an availability constraint
- Scheduling the maintenance on a single machine
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Introduction to Stochastic Programming
- Three perspectives for solving the job grouping problem
- Weibull Models
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
- Non-identical parallel CNC machine scheduling
This page was built for publication: Job scheduling and management of wearing tools with stochastic tool lifetimes